Skip to main content
Posted 24 July, 2026

Electrical Foreman (Substation)

Emory Workforce Solutions
Sioux City, IA, US Full Time

Job Description

*]:pointer-events-auto [content-visibility:auto] supports-[content-visibility:auto]:[contain-intrinsic-size:auto_100lvh] R6Vx5W_threadScrollVars scroll-mb-[calc(var(--scroll-root-safe-area-inset-bottom,0px)+var(--thread-response-height))] scroll-mt-[calc(var(--header-height)+min(200px,max(70px,20svh)))]" dir="auto" data-turn-id="request-WEB:c6709f5e-75f9-4ff3-a526-4f9b9b12bc12-14" data-testid="conversation-turn-2" data-scroll-anchor="false" data-turn="assistant">NOW HIRING: Substation Foreman (High-Voltage Construction)

\n

Location: Iowa
Pay: $45–$65/hr DOE + OT + Per Diem (for travelers)
Project Type: Utility / Substation Construction (Transmission & Distribution)
Employment Type: Full-Time | Long-Term Projects

\n

Lead the Build. Own the Outcome.

\n

Emory Workforce Solutions is seeking a Substation Foreman to lead crews on high-voltage substation construction projects. This is a boots-on-the-ground leadership role for someone who has actually built substations—not just worked around them.

\n

You’ll be responsible for driving production, enforcing safety, and delivering high-quality installations across complex electrical infrastructure projects.

\n

What You’ll Do

\n
    \n
  • Lead and manage field crews (typically 5–20 electricians, operators, and laborers)
  • \n
  • Oversee full-cycle substation construction, including: \n
      \n
    • Structural steel erection
    • \n
    • Bus work and rigid/flexible conductor installation
    • \n
    • Ground grid installation and testing
    • \n
    • Equipment setting (transformers, breakers, switches)
    • \n
    • Control house coordination and cable terminations
    • \n
  • \n
  • Read and execute plans, one-lines, and construction drawings
  • \n
  • Coordinate daily with Project Managers, Engineers, and Inspectors
  • \n
  • Plan work, assign tasks, and drive productivity to meet deadlines
  • \n
  • Ensure strict adherence to OSHA and high-voltage safety standards
  • \n
  • Conduct daily safety meetings (JHAs) and enforce site compliance
  • \n
  • Track progress, materials, and manpower utilization
  • \n
\n

What We’re Looking For

\n
    \n
  • 5–10+ years of substation construction experience (REQUIRED)
  • \n
  • Proven experience as a Foreman or Lead on substation projects
  • \n
  • Strong knowledge of: \n
      \n
    • High-voltage systems (typically 12kV–500kV)
    • \n
    • Substation layout, grounding, and protection systems
    • \n
    • Electrical equipment installation and rigging
    • \n
  • \n
  • Ability to read blueprints, schematics, and one-line diagrams
  • \n
  • Experience managing crews and hitting aggressive schedules
  • \n
  • OSHA 10/30 (preferred)
  • \n
  • NCCER or Journeyman Electrical License (preferred, not always required)
  • \n
  • Willingness to travel (if applicable)
  • \n
\n

What Sets You Apart

\n
    \n
  • You’ve led builds from dirt to energization
  • \n
  • You can run a crew without constant oversight
  • \n
  • You understand both production AND safety at a high level
  • \n
  • You’re the person others look to when things get tight on a job
  • \n
\n

Why Emory Workforce Solutions

\n
    \n
  • We specialize in high-level electrical and infrastructure staffing
  • \n
  • Trusted by firms like Rogers Electric, Vos Electric, and Loenbro
  • \n
  • Consistent, long-term project pipeline (data centers, substations, industrial builds)
  • \n
  • Fast deployment, strong support, and real communication
  • \n
\n

Apply Now

\n

If you’ve actually built substations and led crews, we want to talk.

\n